Before Goods Depart

Pre-Shipment Inspection

Checking quantity, workmanship, packing, and markings against the order before a consignment leaves the supplier — while a problem is still a production issue rather than a freight one.

At a glance

Availability
Being confirmed — enquire first
Timing
When production is substantially complete
Sampling
ISO 2859-1, agreed AQL
Output
Written report before despatch

Service availability pending confirmation

Our inspection service lines, coverage, and the regions we can attend are still being confirmed. Treat this page as a description of intended services rather than a commitment, and contact us before relying on it for a project. An inspection is a sampling exercise unless you commission a full count: it gives you evidence about a lot, not a guarantee about every unit in it. Some destination markets also operate mandated pre-shipment programmes run by government-appointed bodies; we are not appointed to any such programme and will tell you if one applies to your shipment.

About this service

Pre-Shipment Inspection

Pre-shipment inspection is normally carried out when production is substantially complete and the goods are packed or nearly packed — commonly cited as around 80 percent finished. Earlier and there is nothing representative to look at; later and the container is sealed. Timing is the thing most often got wrong.

Sampling follows ISO 2859-1, which indexes sampling plans by acceptance quality limit. The AQL is the maximum proportion of defective items treated as acceptable for the lot, and it is normally set separately for critical, major, and minor defects. General Inspection Level II is the usual default for consumer goods; Level I reduces scrutiny and sample size, Level III increases both. These are commercial decisions and they belong in the brief, not in the inspector's discretion on the day.

Who it is for

Importers and buyers taking delivery of goods they have not seen.

  • Importers buying from overseas manufacturers
  • Retailers with quality obligations to their own customers
  • Buyers whose payment terms are tied to inspection release
  • Anyone who has previously received a consignment that did not match the order

Scope of work

What is checked before despatch

Against the order and the agreed acceptance criteria.

  • Quantity

    Counts against the order, including cartons, units per carton, and any accessories or spares forming part of the supply.

  • Workmanship

    Visual assessment against agreed criteria, with defects classified as critical, major, or minor rather than pooled into one list.

  • Function and fit

    On-site checks appropriate to the product — assembly, basic operation, dimensional conformity — as agreed in the plan.

  • Packing and drop resistance

    Whether the packing protects the goods for the journey they are about to make, including carton marking and palletisation.

  • Labelling and markings

    Product and packaging markings, barcodes, and country-of-origin labelling against what the destination market and your order require.

  • Accompanying documentation

    Whether manuals, certificates, and declarations that should ship with the goods are present and correspond to them.

How it runs

How an inspection is scheduled

Booking and readiness are usually the constraint.

  1. Scope and criteria

    Product, order reference, specification, acceptance criteria, and the AQL and inspection level to be applied.

  2. Readiness confirmation

    The supplier confirms production is far enough along to be representative and that goods are available for sampling.

  3. Attendance and sampling

    Samples are drawn according to the agreed plan and checked against the criteria.

  4. Result determined

    Findings are compared with the acceptance limits, giving a clear pass, fail, or held result rather than an impression.

  5. Report and decision

    The report goes to you before despatch, so the shipping decision is yours to make with the evidence in hand.

Scope

Scope boundaries

What a sampled inspection can and cannot tell you.

What is included

  • Sampling to the agreed ISO 2859-1 plan and inspection level
  • Defects classified as critical, major, or minor against agreed criteria
  • A pass, fail, or held result measured against the acceptance limits
  • A report issued before despatch, in time to act on

What is not included

  • A guarantee about every unit in the lot, unless a full count is commissioned
  • Laboratory testing — on-site checks are not a substitute for it
  • Certification, or any right to apply a conformity marking
  • Government-appointed mandated pre-shipment programmes

Before you start

Common questions

What AQL should we use?

It depends on your product, your market, and your tolerance for returns. Common practice sets a tighter limit for major defects than minor ones and zero for critical defects. We can explain the trade-off, but the numbers are a commercial decision and should be agreed before the inspection, not after the result.

When in production should the inspection happen?

Usually when production is substantially complete and packing is under way — often cited as around 80 percent. Too early and the sample is not representative; too late and there is no time to correct anything before the vessel.

Does a pass mean every item is perfect?

No, and this matters. A pass means the sample drawn met the acceptance limits you set. AQL sampling is a statistical method for making a decision about a lot, not a guarantee about each unit. If you need certainty on every piece, that is a full count and a different engagement.

Can you hold the shipment?

We report; we do not control your supplier's despatch. What an inspection gives you is the evidence and the timing to make that decision yourself, which is why the report is issued before the goods leave.