Third-Party Inspection

Independent inspection commissioned by a buyer, a seller, or a financing party — reporting to whoever commissioned it, not to the party being inspected.

At a glance

Availability
Being confirmed — enquire first
Reports to
The commissioning party
Basis
Your specification and order documents
Output
Written report with evidence

Service availability pending confirmation

Our inspection service lines, coverage, and the regions we can attend are still being confirmed. Treat this page as a description of intended services rather than a commitment, and contact us before relying on it for a project. Separately, note that an inspection report is not certification: it records what was found on a particular day and carries no certification mark. ISO/IEC 17020 is the international standard for bodies performing inspection — we describe it here as context and make no claim to any status under it.

About this service

Third-Party Inspection

A third-party inspection exists because the two parties to a transaction each have an interest in the answer. The buyer wants to know the goods are right; the seller wants to be paid. An inspector with no stake in either outcome produces a record both can rely on, which is why banks and trade finance arrangements often require one.

Independence is the whole product. ISO/IEC 17020, the international standard for inspection bodies, is built around exactly this question — its Type A category covers bodies wholly independent of the parties whose goods they inspect. A new edition published in March 2026 replaces the previous Type A/B/C categories with Type A and Type non-A. It is the framework the industry works to, and it is worth understanding whoever you appoint.

Who it is for

Anyone relying on goods or work they cannot personally stand next to.

  • Buyers purchasing from suppliers in another country
  • Sellers wanting an independent record of what was despatched
  • Banks and trade finance parties requiring inspection before release
  • Contractors verifying subcontracted work before acceptance

Scope of work

What an inspection covers

Agreed in advance, so there is no argument about it afterwards.

  • Conformity to specification

    Whether the goods match the order, drawing, or specification they were bought against — the reference document is agreed before attendance.

  • Quantity and completeness

    Counts against the order, including accessories, spares, and documentation that form part of the supply.

  • Workmanship and condition

    Visual and dimensional assessment against agreed acceptance criteria, with defects classified rather than simply listed.

  • Documentation

    Whether the certificates, test records, and manuals that should accompany the goods are present and correspond to them.

How it runs

From brief to report

Agree the basis, attend, record, report.

  1. Brief and scope

    What needs checking, against which specification, and by when. We confirm what is feasible and what it would cover.

  2. Inspection plan

    Sampling, acceptance criteria, and the checklist are agreed in writing before anyone attends.

  3. Attendance

    An inspector works to the agreed plan on site, recording what is found rather than what was expected.

  4. Findings recorded

    Observations documented with supporting evidence, including photographs where they make a finding clearer.

  5. Report issued

    A written report to the commissioning party, stating what was checked, what was found, and what fell outside the scope.

Scope

Scope boundaries

What an inspection settles, and what it cannot.

What is included

  • Attendance and assessment against the agreed scope and criteria
  • Findings documented with supporting evidence
  • A written report to the party who commissioned it
  • A clear statement of what was outside the scope

What is not included

  • Certification of any kind — an inspection report carries no certification mark
  • Any claim to accreditation or designated status under ISO/IEC 17020
  • Statutory examinations reserved to a competent person
  • A guarantee about units, batches, or dates not inspected

Before you start

Common questions

Who receives the report?

The party who commissioned the inspection. An inspection commissioned by a buyer is reported to the buyer, not to the supplier being inspected. If you want the report shared, that is your decision to make.

Does an inspection produce a certificate?

No. It produces a report describing what was found on a particular day and against a particular scope. That is a different thing from certification, and it carries no certification mark.

What is ISO/IEC 17020?

The international standard setting requirements for bodies performing inspection, covering impartiality, competence, and method. Its independence categories were revised in the edition published in March 2026. It is the framework the sector works to; we set out our own position honestly rather than implying a status we do not hold.

What if the inspection finds problems?

A report recording nonconformity is a successful inspection — it did what it was commissioned to do. What happens next is commercial, between you and your supplier, and a re-inspection can confirm any corrective work.